wildfire
🇮🇳India
Tactical Overlay Active

Forest fire notification in India

Detection System Online
Incident Report

On 08/03/2026, a forest fire started in India, until 14/03/2026.

AegisWatch Crisis Intelligence Summary

TLDR

A significant wildfire has been reported in a green forest area in India, posing a threat to local ecosystems and communities.

Risk Score75%
Hazard Typewildfire

Trajectory: Current wind patterns and dry conditions suggest that the fire could spread rapidly, potentially impacting additional regions if not contained swiftly.

Infrastructure Impact: The wildfire is likely to disrupt transportation routes, threaten residential areas, and endanger infrastructure such as power lines and communication towers.

Source: GDACSProvider: AegisWatchDate:

Event Intelligence Data

Event
Green forest fire notification in India
Hazard Type
Wildfire
Location
Puruna Katak, Boudh, Odisha, India
Coordinates
20.536680, 84.529447
Risk Score
75/100
Severity
1/5
Status
active
Trajectory Prediction
Current wind patterns and dry conditions suggest that the fire could spread rapidly, potentially impacting additional regions if not contained swiftly.
Infrastructure Impact
The wildfire is likely to disrupt transportation routes, threaten residential areas, and endanger infrastructure such as power lines and communication towers.
Source
GDACS
Detected
2026-03-08T00:00:00.000Z
Last Updated
2026-03-15T00:01:11.000Z
Intelligence Provider
AegisWatch Crisis Intelligence Platform

Geospatial Hazard Visualization

Visual Field Intel
Ground Truth

No field intel transmitted for this sector yet.

Ground observation sync in progress...

Tactical Warning

This data is provided for situational awareness ONLY.DO NOT USE FOR EMERGENCY EVACUATION OR TACTICAL DECISIONS.

Tactical Escalation Risk

75%
Status
active
Signal SourceGDACS
Temp
22°C
Wind
1.04m/s
Sector Conditions
Partly Cloudy

Aegis Intelligence Tool

The atmospheric conditions and proximity to critical transmission lines suggest a 45% increase in operational risk within the next 24 hours.

Intelligence Briefing Locked

Upgrade to PRO to access trajectory modeling and critical infrastructure predictions.

Upgrade to PRO

Ground Intel Reports

0 Reports